|
|
|
| Application and Research of Gob Side Entry Retaining with High Water Material |
| MA Min-le1, SUN Chun-dong2,LI Yong-yuan1 |
| 1. Taoyi Mine, Handan Mining Industry Group Corporation Ltd., Jizhong Energy, Handan 056000, China; 2. Handan Mining Industry Group Corporation Ltd., Jizhong Energy, Handan 056000, China |
|
|
|
|
Abstract According to the difficulties that low recovery rate of coal resources, stressed coal mining connection, gas control in down-corner angle, based on the shipping lane geological condition of surrounding rock,Taoyi Mine of Handan Mining Industry Group recommended accommodating the deformation characteristics of surrounding rock of roadway along the empty left lane roadway support scheme and adopted ZKD high-water quick-setting filling material to fill gob side, gob-side entry retaining. The technology was simple and easy to transport, etc., The observation for left roadway surface showed that the average amount of displacement between two sides was less than 20 mm, the top floor was relatively closer to about 300 mm. It got good results.
|
|
|
|
|
|
| [ 1 ] 孙恒虎,赵炳利.沿空留巷的理论与实践[ M ].上海:上海人民出版社,1993.[ 2 ] 董传彤,杨万斌,聂万利,等.复杂条件下沿空留巷支护实践 [ J ].河北建筑科技学院学报,2003,20(3 ):73 - 75.[ 3 ] 孙春东,冯光明. 新型高水材料巷旁充填沿空留巷技术[ J ]. 煤矿开采, 2010,15(1 ):58 - 61. [ 4 ] 胡 华,崔明义.高水材料硬化体特性及其充填体力学作用机理分析[ J ].矿业研究与开发,2001,21(5 ):23 - 25.[ 5 ] 宋存义,陈 克,汪 辉.高水材料的水化硬化反应机理的研究[ J ].矿物岩石地球化学通报,1999,18( 4 ):261 - 263.[ 6 ] 王 飞,张东峰.采空区充填法的应用现状与发展前景[ J ]. 科技情报开发与经济,2009,19(33 ):110 - 111. |
|
|
|