Abstract Based on the problem of insufficient cable load in power supply system on the well, by the transformation of working area 611 cable route on the well in Kailuan Linxi Mine, the reasonable increasing cable selection was discussed. The practice showed that the selected cable was with good effect, met the needs of power supply.
|