Abstract To improve the ventilation system in main return airway and concentrated belt Lane cross fork construction wind bridge,decided to adopt the "anchor net spray + circular steel shed + wall post grouting + pouring concrete" combined support technology and overcomes the large section, large dip angle and the upper ( lower ) mountain construction of many unfavorable factors, to ensure the total return air lane wind bridge construction safety.
|