|
Abstract Based on surrounding rock big loose circle geology condition of Bofang Mine, 3211 return air roadway support of the mine was designed, anchor bolt and anchor rope combined support plan was set up, the support effect was measured on the site. The result showed that the deformation of the return air roadway became stable, the plan was feasible.
|