| Central Control Design of Ningjin Salt Chemical Industry Park Cogeneration First Phase Project |
| SUN Feng-yu1, CHEN Yan2 |
| 1.Hebei Energy Engineering Design Corporation Ltd., Shijiazhuang 050031, China; 2.Xingtai Power Supply Subsidiary of State Grid Corporation Hebei Electric Power Corporation, Xingtai 054000, China |
|
|
|
|
Abstract Aiming at the characteristics of Ningjin Salt Chemical Industry Park cogeneration first phase project, it is pointed out that on the basis of the relative central control, locally scattered layout the auxiliary system operator station, the recommended solutions are: central control room and electronic room are arranged on row B-C at operating layer in main power building, compressed air station control room, chemical water treatment control room and integrated control room are arranged locally in the common system area. Features of the solution are: construction area of the main plant building is reduced, layout is flexible, operation is easy.
|
|
|
|
|
|
| [ 1 ] GB50049—2011,小型火力发电厂设计规范[ S ].
[ 2 ] DL/T5227—2005,火力发电厂辅助系统( 车间 )热工自动化设计技术规定[ S ].
[ 3 ] HT/T20508—2014,控制室设计规范[ S ].
[ 4 ] 张峻峪,王秉钧. 热电联产、以汽定电原则的认定[ J ]. 河北化工,1995(1 ):7.
[ 5 ] 陈希章.化工园区热电厂的规划和建设需注意的几个问题[ J ]. 化学工业,2006(7 ):23.
[ 6 ] 王振铭. 我国热电联产发展的历史、现状与问题[ R ]. 中国石油和化工勘察设计协会热工专委会,2013.
[ 7 ] 王兆鹏. 电厂辅助车间集中控制网在台山电厂设计中的应用[ J ]. 电力建设,2006(7 ):16.
[ 8 ] 施 梁. 辅助控制系统BOP网在台山电厂的应用探讨[ J ]. 中国科技纵横,2011(1 ):20.
[ 9 ] 刘树立. 火力发电厂辅助控制系统中的全新模式[ J ]. 华北电力技术,2013(4 ):32.
[10] 王利华. 火电机组辅助系统一体化控制方案[ J ]. 国网技术学院学报,2004(4 ):26.
[11] 杨金芳. 火电机组辅控一体化集中监控网络方案及配置[ J ]. 电力勘测设计,2012(4 ):28.
[12] 张军荣. 火电厂辅助车间集中控制系统的设计与实施[ J ]. 山西电力,2010(2 ):36.
[13] 吕 玲.火电厂辅助车间集中控制方案研究[ J ]. 中国电力,2009(8 ):32. |
|
|
|