|
Abstract Based on large gas and pressure under large inclined prominent working face, through gas release hole, shallow hole drainage, loosening blasting, high roadway drainage and other measures were adopted to drainage gas, the shallow hole drainage system was transformed, which saved recovery mining cost, realized safe production of the working face and provided technical experience and reference for similar conditions.
|