| Study on the technology of parallel electrical method to explore roof water abundance area in No.8101 Face of Dongfeng Mine |
| Guo Bin |
| Xinzhou Emergency Management Bureau, Xinzhou 034000, China |
|
|
|
|
Abstract In the process of coal mining, the accumulated water in the overlying goaf of coal seam was one of the important factors causing water outburst accidents, which seriously affected the safety production of the lower working face. In order to realize the safe production of No.8101 Face in Dongfeng Mine, through the analysis of the geological and hydrogeological conditions of the working face, the parallel electrical method was used to explore the water abundance of the roof of No.8 coal seam at different heights, and the low-lying area of the overlying No.7 coal seam goaf was found to be ' y ' -shaped distribution. Three exploratory boreholes were constructed in the roof of the lower roadway at 350,370 and 390 m of the upper side roadway to drain the water in the goaf. The total water inflow of the borehole was 9.2 m3 / h when the hole was formed. After 11 days of drainage, the sum of the final water inflow was reduced to 0.8 m3 / h, and the safe mining of the No.8101 Face was realized. It provided experience for other working faces to explore the water abundance abnormal area of the roof.
|
|
|
|
|
|
| [ 1 ] 董书宁,虎维岳. 中国煤矿水害基本特征及其主要影响因素[ J ]. 煤田地质与勘探,2007( 5 ):34 - 38.
[ 2 ] 虎维岳,田 干. 我国煤矿水害类型及其防治对策[ J ]. 煤炭科学技术,2010,38( 1 ):92 - 96.
[ 3 ] 陈江峰,黄玉峰,熊法政. 承压水导升过程中微裂隙扩张分析[ J ]. 地质与勘探,2017,53( 1 ):157 - 163.
[ 4 ] 王 普,周海勇,万广绪,等. 硬厚顶板下邻断层工作面不同推采方向应力特征分析[ J ]. 采矿与岩层控制工程学报,2021( 4 ):63 - 71.
[ 5 ] 王 鹏,鲁晶津,王信文. 再论巷道直流电法超前探测技术的有效性[ J ]. 煤炭科学技术,2020,48( 12 ):257 - 263.
[ 6 ] 白汉营. 深埋土岩界面下煤层开采覆岩破坏致灾机理[ D ]. 徐州:中国矿业大学,2014.
[ 7 ] 李 博. 浅埋煤层覆岩活动规律与顶板水涌出关系数值模拟研究[ D ]. 西安:西安科技大学建筑与土木工程,2019. |
|
|
|