| Application of directional drilling rig in geological structure detection of Hengda Mine |
| Geng Hui1, Jiang Hui2 |
| 1. Fuxin Mining (Group) Co., Ltd., Fuxin 123000, China; 2. Hengda Mine, Fuxin Mining (Group) Co., Ltd.
Fuxin 123000, China |
|
|
|
|
Abstract The No.2171 fully mechanized caving face of Hengda Mine is affected by Ping 'an F1 and F2 faults. The geological structure is complex and there are many associated faults. Single three-dimensional seismic detection can not find out the specific situation. In response to this problem, Hengda Mine used ZYWL-15000DS directional drilling rig to construct directional long boreholes for accurate detection. The existing roadway was used to construct proven structural boreholes to the complex geological structure area of the mining area boundary, and the area involved in the No.2171 Face was comprehensively detected. The practice showed that the regional geological structure of No.2171 Face was proved by directional long drilling rig, and the mining conditions were determined, which provided favorable geological reference conditions for the subsequent working face layout.
|
|
|
|
|
|
| [ 1 ] 谢允飞. 煤矿定向钻进装备及施工方案探讨[ J ]. 机械研究与应用,2018( 4 ):196 - 198.
[ 2 ] 丁小峰. 定向抽采钻机在地质探测中的应用[ J ]. 机械管理开发,2019( 9 ):196 - 197,251.
[ 3 ] 姜海峰,李晓旭. 千米定向钻机对断层构造的探测应用[ J ]. 矿业工程,2018( 1 ):47 - 49.
[ 4 ] 崔 振. 突出煤层条带瓦斯定向钻孔预抽技术研究[ J ]. 机械管理开发,2022( 10 ):148 - 150.
[ 5 ] 王永文,姚宁平,王海龙,等. 高位定向钻孔分层布置与瓦斯抽采效果分析[ J ]. 钻探工程,2022( 4 ):117 - 123. |
|
|
|