| Research on support technology passing large fault in No.2303 Face of Licun Mine |
| Wang Wei |
| Licun Mine of Shanxi Lu 'an Chemical Group Cilinshan Coal Industry Co., Ltd., Changzhi 030600, China |
|
|
|
|
Abstract In order to solve the problems of roof caving and spalling in the fault structure area of the working face, No.2303 Face of Licun Mine was taken as the engineering background, the stress evolution law of the large fault in the working face was studied by numerical simulation. It was concluded that with the decrease of the distance between the working face and the fault, the shear stress increased gradually, and the normal stress decreased gradually. At the same time, grouting reduced the phenomenon of stress concentration and controlled the deformation and failure of the surrounding rock of the working face. Based on the numerical simulation results, the control measures of ' grouting + anchor cable + metal mesh ' were proposed, and the feasibility of the scheme was verified by field industrial test.
|
|
|
|
|
|
| [ 1 ] 马建文. 特厚煤层破碎围岩巷道注浆加固技术应用研究[ J ].
煤,2020,29( 1 ):34 - 36.
[ 2 ] 褚福桥,郝喜庆,桑远虎. 断层破碎带煤巷围岩变形控制技
术研究应用[ J ]. 山东煤炭科技,2022,40( 12 ):72 - 74.
[ 3 ] 王福海,杨永刚,杨张杰,等. 工作面超前预掘巷注浆加固
过断层组技术[ J ]. 煤炭工程,2022,54( 10 ):38 - 42.
[ 4 ] 徐留军. 15301回风顺槽过断层破碎带支护设计及应用[ J ].
煤炭与化工,2022,45( 8 ):15 - 17,22.
[ 5 ] 卜庆为. 新桥矿厚泥岩顶板回采巷道锚杆支护技术研究[ D ].
包头:内蒙古利技大学,2014.
[ 6 ] 冯 飞,张海领. 大采高综采工作面过落差12m大断层技术
研究与应用 [J ]. 山东煤炭科技,2017( 2 ):18-20.
[ 7 ] 刘玉涛,胡全宏. 12106大倾角工作面过断层群的技术研究
与应用[ J ]. 黑龙江科技信息,2012( 19 ):51,168.
[ 8 ] 杨 磷,黄正平. 大倾角综采工作面过斜交断层技术[ J ]. 煤
炭工程,2017,49( 5 ):51-54.
[ 9 ] 曹建波,张宁波. 综采工作面过大断层技术的研究与探讨
[ C ]//煤炭开采新理论与新技术——中国煤炭学会开采专业
委员会2010年学术年会论文集,2010.
[ 10 ] 席敦刚,贾秀春,闫春来. 掘进工作面过老巷及断层期间安
全技术研究[ J ]. 煤矿现代化,2022( 5 ):96-99.
[ 11 ] 陈慧明,王玉新,杨月飞. 大埋深孤岛工作面过断层带回采
技术研究[ J ]. 中州煤炭,2018,40( 1 ):177-182.
[ 12 ] 王建跃. 综采工作面过断层支护技术应用研究[ J ]. 能源与节
能,2021( 2 ):204-205.
[ 13 ] 江 杰,霍晓林. 综掘工作面过断层强化支护技术研究[ J ].
内蒙古煤炭经济,2019( 6 ):70-71.
[ 14 ] 李 超. 断层对大采高综采工作面矿压及顶板运移规律影响
研究[ D ]. 太原:太原理工大学,2016. |
|
|
|