|
|
|
| Optimization practice of support technology for large section open-off cut with mudstone roof |
| Liu Wei |
| Chengjiao Mine of Henan Zhenglong Coal Industry Co., Ltd., Yongcheng 476600, China |
|
|
|
|
Abstract In order to reduce the deformation of surrounding rock in the open-off cut of No.22 coal seam in Chengjiao Mine and ensure the normal installation of equipment, the optimization research of the original cutting roadway support scheme was carried out. The research showed that the main reasons for the unsatisfactory support effect were the low strength of No. 2 coal seam and the direct roof, the large span of the open-off cut and the roof water spray in some areas. FLAC 3D numerical simulation was used to qualitatively analyze the plastic zone depth of roadway under different support schemes. The length of anchor cable was determined to be 10 m, the number of top bolts was 10 / row, and the length was 2 500 mm. The field application showed that after adopting the optimized support scheme, the deformation time of the roadway was short, the maximum roof subsidence was 43 mm, and the displacement of the two sides was 21 mm.
|
|
|
|
|
|
| [ 1 ] 郝玉兵. 8.8 m 超大采高综采工作面设备回撤工艺应用研
究[ J ]. 煤炭科学技术,2022,50( S2 ):50 - 60.
[ 2 ] 张立辉,史佳斌,崔东亮. 8.8 m超大采高工作面矿压显现及顶板控制技术研究[ J ]. 煤炭工程,2022,54( S1 ):67 - 71.
[ 3 ] 魏 斌.大断面开切眼迈步掘进一次成巷工艺技术研究[ J ]. 煤炭工程,2022,54( 7 ):26 - 30.
[ 4 ] 周 刚,李胜虎. 火石咀煤矿综放工作面采煤机扩切眼技术实践[ J ]. 煤炭与化工,2021,44 ( 11 ):14 - 16,19.
[ 5 ] 王伟光. 特厚煤层大断面开切眼推引锚固与复向控制研究[ D ]. 北京:中国矿业大学(北京),2019.
[ 6 ] 赵 瑶. 软弱厚煤层大断面切眼掘进与支护技术[ J ]. 煤炭技术,2021,40( 5 ):61 - 64.
[ 7 ] 王 毅,肖利平,李开学,等. 急倾斜煤层大断面开切眼快速施工技术研究[ J ]. 煤炭工程,2015,47 ( 6 ):58 - 60,63.
[ 8 ] 吴 昕. 采空区下综采工作面开切眼一次成巷支护技术[ J ]. 煤炭科学技术,2015,43( 9 ):139 - 143.
[ 9 ] 侯志远,郭志飚,迟学海. 宏泰煤矿回采巷道支护方案优化的FLAC~(3D)数值模拟分析[ J ]. 现代矿业,2017,33( 11 ):187 - 191.
[ 10 ] 张广超,何富连,来永辉,等. 高强度开采综放工作面区段煤柱合理宽度与控制技术[ J ]. 煤炭学报,2016,41( 9 ): 2 188 - 2 194.
[ 11 ] 张诏飞,席 伟. 基于FLAC3D-RAR的边坡稳定性分析和监测预警[ J ]. 矿业研究与开发,2023,43( 5 ):63 - 68. |
|
|
|