| Application of water seepage grouting plugging technology in large buried depth and high water pressure shaft wall |
| Zhang Haibo |
| Xinjiang Xingmei Mining Industry Co., Ltd., Bayingolin Mongol Autonomous Prefecture 841000, China |
|
|
|
|
Abstract Taking the 667.5 ~ 702.5 m section of the auxiliary shaft of No.1 Mine in Tashidian mining area as an example, the main shaft lining support method was plain concrete support. During the excavation period, the water inflow of this section was 30.2 m3/h, and the water pressure reached 6 MPa. By adopting the combination of ' internal plugging and external discharge ', that is, the hydrophobic depressurization drainage hole was constructed near the + 500 m level of the wellbore to drain and depressurize the water layer section of the lower wellbore of the auxiliary shaft. Combined with the grouting method of long and short holes in the wellbore wall, the lower wellbore wall of the auxiliary shaft was grouted to plug the water inflow of the wellbore wall. Through grouting and plugging, the water inflow of the auxiliary shaft was reduced to less than 10 m3/h, reaching 8.6 m3/h, and the application effect was good.
|
|
|
|
|
|
| 1 ] 李 鹏. 深部大变形巷道注浆加固技术应用[ J ]. 山东煤炭科技,2023,41( 2 ):75 - 77.
[ 2 ] 王东阳. 深部大变形巷道注浆加固技术研究[ J ]. 山西煤炭,2022,42( 1 ):81 - 85.
[ 3 ] 晁红彬,陈 召,王 辉. 破碎围岩巷道注浆关键参数确定及应用[ J ]. 新型工业化,2022,12( 8 ):88 - 90.
[ 4 ] 闫旭兵. 新元煤矿巷道注浆加固及围岩控制技术研究[ J ]. 煤,2023,32( 5 ):42 - 46.
[ 5 ] 韩蓬蓬. 破碎围岩巷道注浆加固技术研究与实践[ J ]. 山东煤炭科技,2023,41( 2 ):48 - 49,52.
[ 6 ] 李衍磊,张忠正. 弱冲环境下巷道注浆加固支护技术及应用[ J ]. 化工管理,2022( 27 ):49 - 51. |
|
|
|