| Support technology practice of top coal cross-cut uncovering in outburst coal seam |
| Zhang Tao, Liu Hongqi |
| Yangdong Mine,Jizhong Energy Fengfeng Group ,Handan 056201, China |
|
|
|
|
Abstract In the process of rock cross-cut coal uncovering in outburst coal seam, due to the soft top coal, large gas content, high pressure and easy to be affected by geological structure, it is very likely to lead to accidents such as roof fall, rib spalling, gas overrun, coal and gas outburst, gas suffocation and so on. During the coal uncovering of No. 8206 transport crosscut in Yangdong Mine, the coal body was reinforced by chemical slurry injection and advanced bolt was installed head-on, which effectively improved the coal body structure, the integrity and bearing capacity of coal body. During the excavation of the coal retaining false roof roadway, the location and shape of the coal seam were mastered by drilling, and the 5 ~ 11 m long anchor cable support was flexibly selected to provide a reliable basis for the anchor cable. The results showed that this measure ensured the strength and stiffness of the roof support during the cross-cut coal uncovering, and realized the rapid, safe and efficient coal uncovering of 8206 cross-cut.
|
|
|
|
|
|
| 1 ] 张西斌,郭建忠,赵东方,等. 强突出煤层石门揭煤顶板固化支护技术研究[ J ]. 内蒙古煤炭经济,2021( 18 ):52 -
53.
[ 2 ] 胡 冲. 渐进式掘进技术在托顶煤石门揭煤中的研究与应用[ J ]. 煤炭与化工,2022,45( 4 ):32 - 34.
[ 3 ] 孙传军,郑思达. 岩巷快速掘进技术研究[ J ]. 江西煤炭科技,2010( 4 ):39-40,38.
[ 4 ] 刘凤鸣. 采空区下注浆堵水技术实践[ J ]. 能源节能,2015
( 2 ):152 - 154.
[ 5 ] 陈鑫源. 深部高应力巷道锚杆支护优化设计研究[ D ]. 长沙:湖南科技大学,2015.
[ 6 ] 高 峰,刘 涛. 孔压力嵌岩桩注浆漏失问题探析——以岩溶地区某工程为例[ J ]. 科技资讯,2008( 19 ):112.
[ 7 ] 涂 磊,李德成. 松软低透气性强突厚煤层快速揭煤技术研
究与应用[ J ]. 能源技术与管理期刊,2017( 4 ):44 - 45.
[ 8 ] 韩老虎,曲义生,郝 涛 . 三软煤层煤巷大跨度交叉点复合支护技术研究与应用[ J ]. 内蒙古煤炭经济,2018( 11 ):
105, 129.
[ 9 ] 姬明琪. 作业面过断层安全开采探究[ J ]. 能源与节能,2020
( 2 ):80 - 81. |
|
|
|