|
|
|
| Structural exploration and control practice of coal seam floor reinforcement in Zhaogu No.1 Mine |
| Wang Xiang |
| Jiaozuo Coal Zhaogu ( Xinxiang ) Energy Co., Ltd., Xinxiang 453634, China |
|
|
|
|
Abstract Mine water damage was important hazard affecting the safe mining of Zhaogu No.1 Mine. In particular, the large water outburst caused by the structure conducting the deep aquifer was important form of mine water damage, which had the great impact on the safe production of the mine. Taking the No.10 injection hole in the ground regional control construction of No.15031 Face of Zhaogu No.1 Mine as an example, through the directional drilling exploration and control of F15 and DF102 faults, the combination of exploration and control was adopted to provide the basis for the structural exploration and control of floor reinforcement in Zhaogu field.
|
|
|
|
|
|
| [ 1 ] 李长青,方 俊,李泉新,等. 煤层底板超前注浆加固定向钻孔注浆工艺技术[ J ]. 煤田地质与勘探,2014,42( 4 ):59 - 63.
[ 2 ] 赵逢春. 赵固一矿矿井水文地质条件分析[ J ]. 中小企业管理与科技(中旬刊),2014( 9 ):121 - 122.
[ 3 ] 姜文浩. 底板含水层注浆改造技术在赵固一矿的应用及日常管理[ J ]. 价值工程,2014( 31 ):119 - 120. |
|
|
|