| Study on forced caving technology of hard thick layer K2 limestone roof in Tiexin Coal Industry |
| Du Wei |
| Shanxi Baoli Tiexin Coal Industry Co., Ltd., Jinzhong 031302, China |
|
|
|
|
Abstract In order to solve the problem of K2 limestone roof hanging at the end of fully mechanized mining face in No.9 coal seam of Tiexin Coal Industry, taking No. 9226 Face mining as the engineering background, the forced caving technology of hard and thick K2 limestone roof is studied. According to the actual conditions of No. 9226 Face, the parameters of fracturing drilling are designed, and the construction scheme of small aperture directional pre-splitting is put forward. The effect of pre-splitting and roof control is monitored and evaluated by drilling peep and the length of hanging roof at the end of working face. The practice shows that the suspended roof distance at the end of No. 9226 Face is reduced from 10 ~ 30 m before fracturing to less than 5 m, and the suspended roof problem is effectively controlled to ensure the production safety of the working face.
|
|
|
|
|
|
| [ 1 ] 梁铁光. 西铭矿坚硬顶板水力压裂弱化技术应用[ J ]. 江西煤炭科技,2023( 2 ):10 - 12,16.
[ 2 ] 朱文秀. 综放工作面坚硬顶板强矿压显现特征及其防治[ J ].石化技术,2023,30( 4 ):293 - 294.
[ 3 ] 白 鹭. 坚硬顶板综采工作面预裂爆破技术研究[ J ]. 山东煤炭科技,2023,41( 4 ):27 - 29.
[ 4 ] 高振宇,罗 文,郑凯歌. 煤层坚硬顶板定向长孔水力压裂技术研究及应用[ J ]. 煤炭工程,2023,55( 4 ):77 - 81.
[ 5 ] 刘瑞丰.岳南煤业厚层坚硬顶板深孔爆破放顶技术研究[ J ].山东煤炭科技,2022( 7 ):14 - 16,20. |
|
|
|