| Study on the setting of waterproof coal pillar in working face under the condition of adjacent goaf with accumulated water |
| Sun Zeguang |
| Ganhe Mine, Shanxi coking coal Huozhou coal power, Hongtong 041000, China |
|
|
|
|
Abstract The No.2-300 transport roadway of Ganhe Mine was faced with the problem of gob-side entry excavating along the goaf with accumulated water. From the perspective of water disaster prevention and control, the water source was analyzed. It was known that the accumulated water in the adjacent goaf was the main water source that threatened its safe production, and the setting of waterproof coal pillars in the section was particularly critical. Through theoretical analysis and calculation, it was concluded that the reasonable coal pillar width was 24.5 m, and the designed coal pillar width was 30 m. In the engineering practice stage, the transient electromagnetic method was used to detect. The results showed that the depth of the water pressure failure zone in the coal pillar was 5 ~ 12 m, the integrity and water isolation effect of the coal pillar were good, and the waterproof coal pillar in the 30 m section was reasonable and reliable.
|
|
|
|
|
|
| [ 1 ] 武宇亮,刘延欣,吴玉石,等. 邻矿采空区积水对边界防水煤柱留设安全性探究[ J ]. 煤炭科技,2022,43( 2 ):80 - 82,93.
[ 2 ] 胡梦玲,郜可欣,叶家桐,等. 临近水库浅埋煤层防水煤柱留设宽度数值模拟[ J ]. 科学技术与工程,2022,22( 3 ):974 - 980.
[ 3 ] 姚忠岭. 胜利煤矿14煤回采工作面防水煤柱留设探究[ J ]. 科技风,2021( 9 ):133 - 134.
[ 4 ] 方 刚,刘 洋,李 昂. 神府矿区浅埋煤层工作面煤柱稳定性评价[ J ]. 煤矿开采,2019,24( 1 ):56 - 61. |
|
|
|