| Design of drilling hole for old goaf water exploration and drainage in same layer in the process of excavation roadway along small coal pillar |
| Ma Sai |
| Zheneng Majialiang Coal Industry Co., Ltd., Jinneng Holdings Coal Group, Shuozhou 036000, China |
|
|
|
|
Abstract The old goaf water in the same layer is a potential safety hazard for excavation roadway along small coal pillar. In order to reasonably design the drilling hole for old goaf water exploration and drainage, this paper took the design of the drilling hole for water exploration and drainage during excavation roadway along No.14203-1 small coal pillar in Majialiang Mine as the research object. Firstly, it was analyzed that the water source was mainly from the goaf of No.14204 face. In order to efficiently and accurately drain the water accumulated in the goaf, the drainage drilling holes were respectively constructed in the auxiliary transport roadway of No.14205 face and the belt transport roadway of No.14203-1 face. Reasonable drilling hole design for water exploration and drainage effectively drained the goaf water in No.14204 face, a total quantity drainage of 140 735 m3, which effectively avoided the occurrence of water outburst accident in No.14203-1 excavation face, and provided important guarantee for safe and efficient construction of excavation face.
|
|
|
|
|
|
| 1 ] 钱鸣高,石平五. 矿山压力与岩层控制[ M ]. 徐州:中国矿业大学出版社,2008.
[ 2 ] 张 洁. 掘进巷道小煤柱采空区探放水施工设计[ J ]. 煤矿现代化,2020( 4 ):194 - 196.
[ 3 ] 马瑞珍. 探放水在掘进工作面中的应用研究[ J ]. 能源技术与管理,2020,45( 1 ):127 - 129.
[ 4 ] 朱永胜. 采空区探放水钻孔施工技术[ J ]. 煤炭科技,2005( 12 ):79.
[ 5 ] 国家安全生产监督管理总局,国家煤矿安全监察局. 煤矿防治水规定[ M ]. 北京:煤炭工业出版社,2014.
[ 6 ] 徐冰寒. 综合物探技术超前探测迎头前方老空巷道[ J ]. 煤矿安全,2013,44( 10 ):20 - 23.
[ 7 ] 张天模,李 健,施龙青. 物探技术在矿井水防治中的应用[ J ]. 西安科技大学学报,2013,33( 1 ):56 - 60. |
|
|
|