|
Abstract In order to solve the problem of serious heave deformation of the roadway, the 28108 working face of Zhenchengdi Mine was taken as the research object, and the numerical simulation software was used to analyze the original support and the condition of the surrounding rock of the roadway without support, and the shortcomings of the original support scheme were given.
|