| Practice of large diameter gas drainage hole in coal mine |
| Zhao Fusen |
| The second hydrogeological team of China Coal Geology Administration, Xingtai, 054000, China |
|
|
|
|
Abstract The lowering of large diameter gas drainage hole casing in coal mine has become the most critical process in the construction process. In order to use the small drilling tower to replace the heavy crane pipe laying process, a set of safe, economic and efficient heavy casing laying process for large-diameter gas drainage holes in coal mines is summarized. Taking the construction of gas direct drainage well in Liangbei Mine of Xuchang Xinlong Mining Industry in Henan Province as an example, based on the principle of ' tunneling buoyancy method ', the various links and data analysis in the process of pipe down are studied. The results show that the use of ' tunneling buoyancy method ' is feasible in the process of placing 246 t casing under 90 t drilling tower, and the safety factor can reach 2.0. Saving crane rental cost 4.25 million yuan, construction period 7 d, whether from the safety, construction period, cost are better than heavy crane pipe process.
|
|
|
|
|
|
| [ 1 ] 杨 健,孙家应,余大有,等. 煤矿地面大口径瓦斯抽排钻孔施工关键技术[ J ]. 煤炭科学技术,2010,38( 11 ):60 - 62.
[ 2 ] 刘 波,马黎明. 大口径钻孔下管固管工艺探讨[ J ]. 中国煤炭地质,2014,26( 6 ):69-70.
[ 3 ] 姚平均,李韶利,陈道元,等. 煤田超大口径套管固井技术[ J ]. 石油钻采工艺,2013,35( 1 ):31-33.
[ 4 ] 袁志坚. 提吊加浮力塞下管法在大口径瓦斯抽排孔的应用[ J ]. 探矿工程:岩土钻掘工程,2008,35( 1 ):27-29.
[ 5 ] 李宏伟,李 磊,刘宪全. 淮南张集煤矿1号大口径瓦斯抽排井施工实践[ J ]. 探矿工程,2002( 6 ):15-16. |
|
|
|