|
|
|
| Application of integral top beam combined suspension hydraulic support in design working face of corner coal area |
| Che Gengen |
| Huayang No. 1 Mine Electrical and Mechanical Work Zone, Yangquan 045000, China |
|
|
|
|
Abstract Due to the complexity of geological structure and regional design, the length of working face is constantly changing during mining, and the number of demolition and relocation is frequent. In view of this problem, taking the corner coal area of 80620 working face in Huayang No. 1 Coal Mine as an example, according to the existing geological conditions of the working face, the length of the working face and the trapezoidal section of the working face, the integral roof beam combined suspension hydraulic support was applied in the design of the working face in the corner coal area from the aspects of safety, reliability, economy, transportation and employment, which met the production needs of 80620 working face in Huayang No. 1 Coal Mine.
|
|
|
|
|
|
| [ 1 ] 沈占彬,王立亚. 悬移支架在复采面的应用[ J ]. 煤矿机械,2010( 9 ):192 - 193.
[ 2 ] 金朝伟,刘建华. ZH1600/16/24Z整体顶梁组合悬移支架的改进[ J ]. 煤矿机械,2011( 11 ):171 - 172.
[ 3 ] 周恩显,王士栋,刘传友,等. 整体顶梁悬移液压支架在三软不稳定煤层中的应用[ J ]. 中州煤炭,2008( 5 ):26 - 27. |
|
|
|