| Water filling condition analysis and advanced detection project of No.10-2012 roadway in Mugua Min |
| Hu Xuedun |
| Fangshan Mugua Mine, Huozhou Coal Power Group Lvliangshan Coal Power Co., Ltd, Lvliang 033000, China |
|
|
|
|
Abstract Taking the hydrogeological condition of No.10-2012 roadway in Mugua Mine as the engineering background,water filling condition of No.10-2012 roadway in the mine were analyzed. The excavation of test roadway was mainly affected by surface water and roof aquifer. The advanced detection project of roadway excavation in No.10-2012 roadway was designed. Two low resistance abnormity areas were found by transient electromagnetic detection. The use of drilling hole water detection verified that the flood threat was eliminated. At the same time, based on the water inflow during roadway excavation, water prevention and control measures for working face were put forward.
|
|
|
|
|
|
| 1 ] 贾 佳. 煤矿防治水工作面临的困境及对策[ J ]. 矿业装备,2021( 5 ):128 - 129.
[ 2 ] 高丁丁. 瞬变电磁法在工作面防治水中的应用[ J ]. 陕西煤炭,2021,40( 5 ):180 - 183,200.
[ 3 ] 王春林,刘 洋,方 刚,等. 榆横北区富水煤层巷道掘进防治水技术[ J ]. 煤矿安全,2021,52( 9 ):102 - 107.
[ 4 ] 郝海涛. 庞庞塔煤矿回采巷道顶板防治水技术研究[ J ]. 煤矿现代化,2020( 5 ):111 - 113,116. |
|
|
|