| Study on application of cutting roof protection technology in 10-102 working face of Mugua Mine |
| Pan Ruifeng |
Mugua Mine, Lvliangshan Coal and Electricity Corporation Ltd., Huozhou Coal and Electricity Group,
Lvliang 033100, China |
|
|
|
|
Abstract In order to solve the problem of serious deformation of the return airway in the corresponding section after the stoppage of the coal mining face in the Mugua Mine, numerical simulation and theoretical analysis were used to determine the reasonable stoppage of the coal pillar width at the 10-102 working face, as 70 m. Using hydraulic fracturing and cutting top pressure-relief technology could effectively reduce the disturbance of the surrounding rock in the working face. The hydraulic fracturing drilling parameters were designed according to the specific mining technical conditions of the 10-102 working face. During the field application, the working resistance of the hydraulic support on the working face and the surrounding rock displacement of the return airway were observed. The hydraulic fracturing drilling holes were arranged in the working roadways on both sides of the working face, and the cutting effect was good. The deformation of surrounding rock was effectively controlled within a reasonable range, and a good application effect was obtained.
|
|
|
|
|
|
| [ 1 ] 吕保江,赵杨阳. 长平煤矿超前预裂爆破切顶卸压技术及成本分析[ J/OL ]. 能源与环保,2019( 9 ):202 - 206[ 2019-10-11 ]. https://doi.org/10.19389/j.cnki. 1003 - 0506. 2019. 09. 050.
[ 2 ] 董亮亮. 预裂切顶卸压技术在王庄煤矿6212工作面的应用[ J ]. 煤,2019,28( 9 ):54 - 55,83.
[ 3 ] 郭晋杰. 三交河煤矿11-201工作面两巷水力压裂切顶卸压技术实践[ J ]. 能源技术与管理,2019,44( 4 ):111 - 113.
[ 4 ] 温中义. 永城矿区大埋深、中厚煤层无煤柱开采实践[ J ]. 地下空间与工程学报,2019,15( S1 ):256 - 259. |
|
|
|