|
Abstract Based on ?power distribution system of Gushuyuan Mine, reactive power compensation capacity and harmonic content were analyzed according to topology structure of power supply network and electrical parameters related to hoist. Power quality improvement scheme based on the combination of SVG of static reactive power device and FC of filter was designed, power netting state before and after improvement was compared and analyzed combined with mine working.
|