|
Abstract Waste rock taking 60% of raw coal, -6 mm size accounting for 2/3, in order to solve the problem, 3GHMC1200 / 850A dense medium cyclone was changed to S-3GHMC440/260 dense medium cyclone, dense medium system of Nanguan Coal Preparation Plant was tested and optimized, the production problem was solved after the corresponding measures were given.
|