|
Abstract Based on the large input but little return in the end-located drainage roadway crossing layers drilling of Sijiazhuang Mine, with low drilling content, with long drainage, mall quantity and poor drainage effect, the drilling sealing technology was analyzed, protecting coal instead of rock in end-located drainage roadway technology was studied to improve the sealing rate and reduce the cost.
|