| Study on deformation mechanism of surrounding rocks of isolated face |
| Bai Lu1, Dong Fei1, Guo Lijun2, Wang Kai2 |
| 1. Changcun Mine, Shanxi Lu'an Environmental Protection Energy Development Corporation Ltd., Changzhi 046000, China; 2. School of Mining and Geomatics, Hebei University of Engineering, Handan 056038, China |
|
|
|
|
Abstract As a major threat of safe mining, recovering roadway deformation in isolated island, based on the fully understanding of the deformation failure mechanism, the controlling measures were given to ensure safe mining. S6-5 isolated island of Changcun Mine of Lu’an Group was taken as study object, FLAC3D was adopted to study the deformation feature and mechanism in recovering roadway, which provided theoretical reference for roadway support. The result showed that the stress concentrated in the front of coal wall, the advanced support peaked at the head of coal wall about 8 m, with the peaking value 14.8 MPa, the reason of large deformation in roadway due to the increasing vertical stress and the complex strata, the bolt-mesh-anchor combined support was put forward to reinforce the support of two sides.
|
|
|
|
|
|
| [ 1 ] 刘 淑. 孤岛工作面沿空掘巷矿压特征及围岩控制技术研究[ D ]. 淮南:安徽理工大学,2010.
[ 2 ] 华心祝,刘 淑,刘增辉,等. 孤岛工作面沿空掘巷矿压特征研究及工程应用[ J ]. 采矿与安全工程学报,2011,30( 8 ):1 646 - 1 651.
[ 3 ] 钱鸣高,石平五. 矿山压力与岩层控制[ M ]. 徐州:中国矿业大学出版社,2003:21 - 46.
[ 4 ] 马占元. 孤岛工作面沿空巷道锚固体结构对巷道的影响[ J ]. 江西煤炭科技,2014( 3 ):173 - 175.
[ 5 ] 魏红印. 高预紧力锚杆在孤岛工作面巷道中的应用研究[ J ]. 能源与节能,2015( 9 ):187 - 188.
[ 6 ] 余伟健,王卫军,黄文忠,等. 高应力软岩巷道变形与破坏机制及返修控制技术[ J ]. 煤炭学报,2014,39( 4 ) :614 - 623.
[ 7 ] 姚 琦,冯 涛,王卫军,等. 极破碎围岩半煤岩巷变形破坏机理及支护控制研究[ J ]. 中国安全生产科学技术,2015,11( 5 ):32 - 39.
[ 8 ] 宋艳芳,唐 治,潘一山,等. 孤岛工作面应力分布规律的数值分析[ J ]. 中国地质灾害与防治学报,2012,23( 4 ):65 - 68. |
|
|
|