|
Abstract In order to control JDX6 collapsed coal column of No. 2 shaft 2314 working face, comprehensive detection was applied, the collapsed coal column was reinforced by physical prospecting and probing, numerical simulation and calculation formula, with good effect. A set of coal column reinforcement was set up.
|