| Scheme design of drainage system with hydrophobic and depressurization in Beiyangzhuang Mine |
| Liu Fan |
| Tangshan Kailuan Survey and Design Corporation Ltd.,Tangshan 063018, China |
|
|
|
|
Abstract Based on uplifting Ordovician limestone influenced by F201-2 fault in south lane of Beiyangzhuang Mine and main coal seam threatened by Ordovician limestone water, the drainage system with hydrophobic and depressurization which was suitable for this mine was put forward through technical and economic comparison according to occurrence and hydrogeological condition of this coal seam and combining with the existing project. The practice showed that Ordovician limestone water head pressure of coal seam floor was effectively reduced to reach requirements of mine safety mining. This scheme provided reference for other mines in the area.
|
|
|
|
|
|
| [ 1 ] 国家安全生产监督管理总局,国家煤矿安全监察局. 煤矿安全规程[ M ]. 北京:煤炭工业出版社,2016.
[ 2 ] GB 50215 - 2015,煤炭工业矿井设计规范[ S ]. .
[ 3 ] 郭 波,宋铁成,刘晓飞. 关于疏水降压技术的应用讨论[ J ]. 科技风,2010( 18 ):130.
[ 4 ] 葛家德,王经明. 疏水降压法在工作面防治水中的应用[ J ].煤炭工程,2007( 8 ):63 - 65. |
|
|
|