|
|
|
| The numerical simulation of relationship between advanced impact length and mining degree based on high #br#
density mining conditions |
| Zhang Qiang |
| BinChang Dafoshi Colliery., Ltd, Shanmei Group , xianyang 713500, China |
|
|
|
|
Abstract In the process of coal mine , when the length of working face advancing to start lengh, , the surface sunk ahead of working face along with working face advancing, and with the increase of the mining degree , the advanced impact length increased at first and tended to stability. In order to study the relationship between advanced impact length and mining degree based on shallow buried and intensity mining conditions, the UDEC simulation software were utilized and it's verified by data in Halagou Colliery.The results show that the advanced impact length lags behind working face a certain distance when the working face arrived at the start length in the shallow buried and intensity mining conditions;with the increase of mining degree, the advanced impact length gradually increased and then decreased to a stable value. It has a certain reference significance for the study of the surface movement dynamic situation in shallow buried and intensity mining conditions.
|
|
|
|
|
|
| [ 1 ] 郭文兵. 煤矿开采损害与保护[ M ]. 北京:煤炭工业出版社, 2013.
[ 2 ] 于秋鸽,郭文兵. 地下非充分采动对地表民房的采动影响范
围研究[ J ]. 煤炭科学技术,2016( 7 ):191 - 195.
[ 3 ] 何国清,杨 伦,凌赓娣,等. 矿山开采沉陷学[ M ]. 徐州:中国矿业大学出版社, 1989.
[ 4 ] 陈俊杰,南 华,闫伟涛,等. 浅埋深高强度开采地表动态移动变形特征[ J ]. 煤炭科学技术,2016( 3 ):158 - 162.
[ 5 ] 杨登峰. 西部浅埋煤层高强度开采顶板切落机理研究[ D ]. 北京:中国矿业大学,2016:43 - 50.
[ 6 ] 范立民,马熊德,李永红,等. 西部高强度采煤区矿山地质灾害现状与防控技术[ J ]. 煤炭学报,2017( 2 ):276 - 285.
[ 7 ] 李圣军. 哈拉沟煤矿高强度开采覆岩与地表破坏特征研究[ D ]. 焦作:河南理工大学,2015:25 - 30. |
|
|
|