| Analysis of monitoring pressure in 3-707 working face roadway construction |
| Zhao Liang |
| Shanxi Province Changzhi Jingfang Coal Industry Corporation Ltd., Changzhi 047100, China |
|
|
|
|
Abstract In order to analyze pressure changing in 3-707 working face roadway construction, 3 groups of observation stations were set to monitor roadway surface convergence, roadway roof seperation capacity and stress of anchor. The results showed that roadway surface convergence became stable with range of 94 ~ 128 mm and 110 mm as average value after 40 m driving; roadway roof seperation capacity became stable with range of 17 ~ 22 mm and 18.7 mm as average value after 40 m driving; maximum stress of anchor was appeared with range of 4.9 ~ 5.2 MPa and 5.14 MPa as average value in about 30m part of roadway advancement.
|
|
|
|
|
|
| [ 1 ] 胡国伟,靳钟铭. 大采高综采工作面矿压观测及其显现规律研究[ J ]. 太原理工大学学报,2006( 2 ):127 - 130.
[ 2 ] 汤建泉,粟才全,李英德. 现场矿压观测方案设计[ J ]. 煤矿开采,2008( 1 ):71 - 74.
[ 3 ] 苏学贵,李彦斌,田万寿. 煤矿巷道支护与矿压观测研究[ J ]. 太原理工大学学报,2008( 5 ):527 - 529.
[ 4 ] 孟宪锐,周昌兴,王鸿鹏,等. 千米深部大倾角特厚煤层综放回采巷道矿压显现规律研究[ J ]. 煤,2008( 1 1):1 - 4.
[ 5 ] 汪青仓,赵永飞. 浅埋深工作面矿压观测[ J ]. 矿山压力与顶板管理,2004( 3 ):82 - 84. |
|
|
|