|
|
|
| Study on technique for passing through vacant channel and super - high section support in fully mechanized caving face of second set of West Wing coal pillar |
| Liu Bingchen, Liu Xinxin |
| Gushuyuan Coal Mine of Shanxi Jincheng anthracite Mining Group Corporation Ltd., Jincheng 048000, China |
|
|
|
|
Abstract Based on actual geological conditions of fully mechanized coal mining face in the west wing of the second plate area, there were nine empty and parallel faces or crossings in mining area and three super high heights were above five meters, which brought great difficulty to mining. In order to achieve maximum recovery of coal resources safely and efficiently, fully mechanized coal mining face in two district West Wing coal pillar was taken as background. Key techniques of ultra high section support method and crossing gob mining technology were studied and analyzed, as well as adopting techniques of shed support and taking the top bottom crossing gob etc. The results showed that the method could meet requirements of extra-high roadway support and mining of fully mechanized coal mining face in the future, which provided a reliable theoretical basis and practical basis for similar conditions.
|
|
|
|
|
|
| [ 1 ] 张 莉,龚梦秋. 综采工作面过老巷连续回采技术探讨[ J ].
水利采煤及管道运输,2012( 1 ):80 - 82.
[ 2 ] 陈 胜,陈 虎. 综采工作面过老巷技术研究[ J ]. 山东煤炭科技,2012( 3 ):32 - 33. |
|
|
|