| Numerical simulation study on isolated island working face mining pressure of Changcun Mine |
| Dong Fei1, Wang Kai2, Guo Lijun2 |
| 1. Changcun Mine, Shanxi Lu'an Environmental Protection Energy Development Corporation Ltd., Changzhi 046000, China; 2. School of Mining and Surveying Engineering, Hebei University of Engineering, Handan 056038, China |
|
|
|
|
Abstract Based on the engineering background of the s6-5 isolated island working face in Changcun Mine, the stress distribution characteristics of the s6-5 island face in Changcun Mine were studied by Flac3D numerical simulation software. The results show that the stress of the slab in the goaf area of the s6-5 face is gradually increased after the crust compaction, and the stress concentration in the upper and lower ends of the coal face in the working face is obvious, and the crust is serious. Brokenness is low. The surface of the roof and the overburden layer of the pressure is apparently relieved. In the upper and lower sections of the protection of the coal pillar,the stress peak on the stack is concentrated obviously. The scope of the roadway pillar stress in the open cut to the face of the coal wall is larger and concentrated.
|
|
|
|
|
|
| [ 1 ] 刘 淑. 孤岛工作面沿空掘巷矿压特征及围岩控制技术研究[ D ]. 淮南:安徽理工大学,2010.
[ 2 ] 华心祝,刘 淑,刘增辉,等. 孤岛工作面沿空掘巷矿压特征研究及工程应用[ J ]. 采矿与安全工程学报,2011,30( 8 ):1 646 - 1 651.
[ 3 ] 钱鸣高,石平五. 矿山压力与岩层控制[ M ]. 徐州:中国矿业大学出版社,2003:21 - 46.
[ 4 ] 王永瑞,魏 辉. 深部孤岛工作面残留煤柱冲击地压防治技术研究[ J ]. 中国煤炭,2017( 5 ):57 - 59.
[ 5 ] 杨伟利,姜福兴,杨 鹏,等. 巨厚岩浆岩失稳的大孤岛工作面防冲研究[ J ]. 岩石力学与工程学报,2017( S1 ):3 382 - 3 391.
[ 6 ] 张宏伟,李云鹏,陈 蓥,等. 三硬条件下孤岛工作面安全推进速度研究[ J ]. 煤炭科学技术,2017( 2 ):6 - 11.
[ 7 ] 宋艳芳,唐 治,潘一山,等.孤岛工作面应力分布规律的数值分析[ J ]. 中国地质灾害与防治学报,2012,23( 4 ):65-68. |
|
|
|