|
Abstract Three concentrated roadway upper coal group in Zhengming Mine, shouldering the air return, transportation task, in order to make upper coal group mining cross Gaozhuang reservoir, combining pre-mining TEM and drilling, the geological structure affecting the upper coal group was analyzed, the reasonable mining plan was settled to make sure the mining through Gaozhuang reservoir.
|