| Research and application of support technology in isolated island working face recovery roadway |
| Guo Xiaolu |
| Yechuan Mining Industry Corporation Ltd., Shanxi Coal Sales and Transportation Group, Gaoping 048400, China |
|
|
|
|
Abstract The disadvantages of physical mechanical properties of coal rock to surrounding rock control was analyzed based on No. 3 coal seam geological features of Yechuan Mining Industry, therefore, the mechanism of coal column strong concentrated stress in isolated island working face was analyzed, the stability of coal column depends on the appropriate width of Elastic stress nucleus after the plastic deformation failure. Distribution and evolution of stress field and displacement field, evolution law of coal column in isolated island were simulated by FLAC3D. The technology got good result in support parameters and monitoring information feedback treatment in 3102 isolated island of No. 3 coal seam in Yechuan Mining Industry.
|
|
|
|
|
|
| [ 1 ] 张 寅,郝相龙,张吉雄. 孤岛工作面回采巷道围岩变形的控制[ J ].矿山压力与顶板管理,2003,44( 3 ):44-46.
[ 2 ] 张科学,冯江兵,路希伟,等. 孤岛工作面回采巷道锚杆控制技术[ J ].煤矿安全,2011,42( 1 ):60-63.
[ 3 ] 曾庆科,尹英文,付佩河. 孤岛工作面回采巷道支护技术研究[ J ].山东煤炭科技,2013,12( 2 ):100-101.
[ 4 ] 陈 宇. 孤岛煤柱安全开采及巷道维护技术研究[ D ]. 淮南:安徽理工大学,2007:52 - 56.
[ 5 ] 邵景柱. 孤岛综放采场覆岩运动破坏特征和矿压显现研究[ D ]. 沈阳:东北大学,2003:82 - 866.
[ 6 ] 殷德威,李志强. 综放孤岛工作面回采技术研究[ J ]. 煤矿现代化,2004,42( 2 ):60-63.
[ 7 ] 屠世浩,郝明奎,谢耀社. 孤岛煤柱综采工作面旋转开采关键技术[ J ].中国矿业大学学报,2004,33( 5 ):520 - 523.
[ 8 ] 陈炎光,陆士良. 中国煤矿巷道围岩控制[ M ]. 徐州:中国矿业大学出版社,1994.
[ 9 ] 钱鸣高,石平五.矿山压力与岩层控制[ M ]. 徐州:中国矿业大学出版社,2003.
[ 10 ] 柏建彪. 沿空掘巷围岩控制[ M ]. 徐州:中国矿业大学出版社,2006. |
|
|
|