|
Abstract Based on the geology structure and water-bearing of coal seam floor stratum in fully mechanized working face recovery under thick coal seam, in order to ensure the safety of working face recovery, radio wave tunnel perspective and underground transient electromagnetic method were used to detect the geology structure and abnormal water-bearing area, the safety of recovery mining was analyzed and demonstrated, which provided technical reference for safe mining.
|