|
Abstract Based on large thickness and low strength of No. 3 coal seam, with joint and fracture development, large section of working face, subsidence of roof roadway along floor, mining roadway along roof was adopted, based on the analysis of ground stress, the support along roof was put forward according to dynamic information design, the practice showed that the technology met the needs of control of surrounding rock, with less obvious deformation of surrounding rock along roof.
|