|
|
|
| Research and application of treatment technology and hidden subsided column exploration |
| Wu Wenqing1, Li Chong2 |
| 1. Jizhong Energy Fengfeng Group Corporation Ltd., Handan 056200, China; 2. Jizhong Energy Fengfeng Group Corporation Ltd., Handan 056107, China |
|
|
|
|
Abstract Mine flooding accidents were easily triggered by collapse column especially concealed conducting water of collapse column, including its unclear exploration, management didn’t reach the designated position and blind reveal. In order to avoid water inrush accidents caused by mistakes in mining process, we needed to make sure ahead of working face advancing that whether concealed collapse column existed in scope of working face. Taking Jiulong Mine as example, occurrence state and form of concealed collapse column in coal floor were detected by ground area advanced management technology, together with grouting strengthening management, which eliminated water inrush danger in coal floor and achieved safety mining in deep coal seam.
|
|
|
|
|
|
| [ 1 ] 赵苏启,武 强,郭启文,等. 导水陷落柱突水淹井的综合治理技术[ J ]. 中国煤炭,2004,30( 7 ):25 - 27.
[ 2 ] 李永军,彭苏萍. 华北煤田岩溶陷落柱分类及其特征[ J ]. 煤田地质与勘探,2006,34( 4 ):53 - 57.
[ 3 ] 李 冲. 大采深矿井导水断层探测与治理技术研究[ J ]. 煤炭与化工,2016,39( 2 ):70 - 72.
[ 4 ] 许进鹏. 陷落柱活化导水机理研究[ D ]. 山东:山东科技大学,2006.
[ 5 ] 尹尚先,武 强. 煤层底板陷落柱突水模拟及机理分析[ J ]. 岩石力学与工程学报,2004,23( 15 ):2 551 - 2 556.
[ 6 ] 李 冲. 深部矿井奥灰水害防治技术[ J ]. 煤矿安全,2016,47( 5 ):101 - 103. |
|
|
|