|
|
|
| Study on mining technique of present packing body in roadway concrete wall without coal pillars |
| Li Hongtao, Wang Yufeng, Yan Jinfeng |
| Changcun Coal Mine of Lu'an Environmental Energy Corporation Ltd., Changzhi 046102,China |
|
|
|
|
Abstract To decrease loss of coal pillars, make full use of advantages of gob-side entry driving and avoid effect of secondary mining on gob-side entry driving filling wall, mining technique of present packing body in roadway concrete wall without coal pillars in Changcun Coal Mine S511 fully mechanized caving faces was put forward through analysis of surrounding rock structure stability and determination of filling body parameters based on numerical simulation. As a result, with 1.6 m wide and C30 strength concrete wall, this technical test had achieved initial success with anchor wire rope single column support.
|
|
|
|
|
|
| 1 ] 陈炎光,陆士良. 中国煤矿巷道围岩控制[ M ]. 徐州:中国矿
业大学出版社,1994.
[ 2 ] 柏建彪. 沿空掘巷围岩控制[ M ]. 徐州:中国矿业大学出版
社,2006.
[ 3 ] 郭育光,柏建彪,侯朝炯. 沿空留巷巷旁充填体主要参数研
究[ J ]. 中国矿业大学学报,1992( 4 ):4-14.
[ 4 ] 漆泰岳,郭育光,侯朝炯. 沿空留巷整体浇注护巷带适应性
研究[ J ]. 煤炭学报,1999( 3 ):34-38.
[ 5 ] 徐金海,付宝杰,周保精. 沿空留巷充填体的流变特性分析
[ J ]. 中国矿业大学学报,2008( 5 ):585-589.
[ 6 ] 张东升,马立强,冯光明,等. 综放巷内充填原位沿空留巷
技术[ J ]. 岩石力学与工程学报,2005( 7 ):1 164-1 168.
[ 7 ] 马立强,张东升,王红胜,等. 厚煤层巷内预置充填带无煤
柱开采技术[ J ]. 岩石力学与工程学报,2010( 4 ):674-680.
[ 8 ] 张东升,马立强,缪协兴,等. 综放沿空留巷围岩变形影响
因素的分析[ J ]. 中国矿业大学学报,2006( 1 ):1-6.
[ 9 ] 钱鸣高,缪协兴,何富连. 采场“砌体梁”结构的关键块分
析[ J ]. 煤炭学报,1994( 6 ):557-563.
[ 10 ] 侯朝炯,李学华. 综放沿空掘巷围岩大、小结构的稳定性原
理[ J ]. 煤炭学报,2001( 1 ):1-7.
[ 11 ] 周保精,徐金海,倪海敏. 小宽高比充填体沿空留巷稳定性
研究[ J ]. 煤炭学报,2010( S1 ):33-37.
[ 12 ] 王卫军,侯朝炯,李学华. 老顶给定变形下综放沿空掘巷合
理定位分析[ J ]. 湘潭矿业学院学报,2001( 2 ):1-4. |
|
|
|