|
Abstract Based on poor coal seam occurrence, complex tectonic situation and unstable roof of Lvjiatuo Mining Branch, the company started with technology, production management, improved the material, technology and method that corresponded to the problem of roadway mining working face roof, completed management requirements and the system, which enabled the mine to prevent roof risk and danger in mining and improve the mining rate.
|