| Technology and Application of Fully Mechanized Working Face Rapid Crossing Fault |
| CHEN Sheng, YU Hai-yang, BIAN De-long |
| Dongtan Mine, Yanzhou Mining Group Corporation Ltd., Zoucheng 273512, China |
|
|
|
|
Abstract 143下06 fully mechanized working face crossing NF6 fault in Dongtan Mine was taken as example, based on fault occurrence and fall condition, when advancing from fault foot wall to hanging wall, cutting horizon was controlled by advanced brake knife cut bottom, which could pull advanced support to maintain roof when crossing fault, metal mesh combined with upper plate beam in broken roof area was used to support roof, with favorable crossing NF6 fault, which provided advantages for working face advancing and efficiency.
|
|
|
|
|
|
| [ 1 ] 刘志刚,张华清. 综采工作面过断层技术与实践 [ J ]. 煤矿开采,2010(5 ):38-39.
[ 2 ] 刘鸿博,邓庆鹏,刘克生,等. 综放工作面过断层开采技术 [ J ]. 煤炭技术,2008(1 ):51-53.
[ 3 ] 周祖舜,王 涛. 综采工作面过大断层实践探讨[ J ]. 中国煤炭,2011(5 ):68-70.
[ 4 ] 朱 杰. 综采面直接过断层研究[ J ]. 黑龙江煤炭科技,2015(3 ):95.
[ 5 ] 王富刚. 综放工作面过断层技术研究与实践[ J ]. 内蒙古煤炭经济,2014(5 ):104,112.
[ 6 ] 杨孟达,刘新华. 煤矿地质学[ M ]. 北京煤炭工业出版社,2000. |
|
|
|