|
Abstract Based on the pouring water problem of 1101 transportation roadway of Shuangliu Mine, the characteristics of pouring water was analyzed, the plan of measuring the water quantity was carried out, the water features was evaluated, the optimized plan of anchoring under pouring water condition was got, which better solved the surrounding rock control difficulty of pouring water broken roof roadway in mining.
|