|
Abstract 307 belt roadway of No. 11 coal seam of Jinhuagong Mine was taken as study object, the roof rock sample experiment, field monitoring, FLAC3D calculation model for numerical analysis were adopted to conduct numerical analysis, the roadway support design was optimized, by support industrial experiment and demonstration of mine pressure monitoring, the optimized support plan was adopted, which saved 21% of the cost.
|