|
Abstract Based on 6377 working face roof rich water geological condition of Lvjiatuo Mining Industry Branch of Kailuan Group, combined with the working face feature and actual production, anchor net construction under rich water of roof was analyzed and studied, a set of construction technology and safe measures were settled. The anchor net support construction support plan was given, the feasibility of the support plan was proved, with reasonable and effective support.
|