|
Abstract Based on time and space influence problem between working face recovery and prepared mining area uphill roadway, through the theoretical calculation and analysis of empirical data, it was got that working face recovery exerted influence on prepared mining area uphill roadway. Adjusting mining production time and optimizing construction organization process were put forward, improving mining area roadway support strength could control the time and scope of the influence, provided technical experience and reference for similar conditions.
|