| Study on the Process of Fully Mechanized Caving Working Face Rotation Mining Technology under Complicated Geological Conditions |
| CUI Jing-kun 1,2, YOU Xiao-wei 1, FENG Yun-lei 1, Gu Ya-dong1,LI Xu-ning 1 |
| 1.College of Resource, Hebei University of Engineering, Handan 056038, China; 2. Hebei Technology Research Center of Coal Mine Construction Engineering, Handan 056038, China |
|
|
|
|
Abstract Based on the analysis of the rotating mining technology of the fully mechanized caving coal mining working face in Shenjiazhuang mine, the rotating mining technical process of the fully mechanized caving coal mining working face was analyzed, and the key problem in the rotating mining process was solved, which achieved an ideal effect both in economy and technology and provided an valuable experience to mines that mined in the similar condition.
|
|
|
|
|
|
| [ 1 ] 陈炎光,徐永圻. 中国采煤方法[ M ]. 徐州:中国矿业大学出版社,1991.
[ 2 ] 魏新贤,张 炜,周 荣. 综采工作面旋转开采技术研究[ J ].山东煤炭科技,2006(6):64-65.
[ 3 ] 陈 贵,常聚才. 综放工作面旋转回采的关键技术与实践[ J ]. 煤矿开采,2010,15(5):26-27.
[ 4 ] 刘 斌. 残采煤柱工作面开采方案设计与应用[ J ]. 煤矿开采,2007,12(2):32-33.
[ 5 ] 陈 勇,王红胜. 旋转开采技术在上行开采不规则薄煤层综采面的实践[ J ]. 中国煤炭,2009,35(10):56-59.
[ 6 ] 赵志杰,尹中凯. 综采工作面调采延长技术的研究与应用[ J ]. 煤矿开采,2009,14(2):25-26. |
|
|
|