| Xin’an Mine Initial Ground Stress Field Inversion Simulation and Characteristics Analysis |
| LI Qiang |
| Xin’an Mine, Shuangyashan Branch, Long Mine Group, Shuangyashan 155100, China |
|
|
|
|
Abstract Initial geostress field was important basis of coal mining engineering design and safety analysis, usually the measured in-situ stress point was little, based on the limited ground stress data, inverse analysis method obtained to get the whole stress field was adopted. Based on the measured data of in-situ stress, combined with Xin’an Mine landform condition and geological structure features, Xin’an Mine ground stress field distribution characteristics were studied; On this basis, finite difference mathematical model of multivariate regression method was adopted, the sixth and seventh mining area of Xin’an Mine three dimensional stress field inversion analysis was conducted, the in-situ stress distribution rule and influence factors were obtained. The result showed Xin’an Mine ground stress field distribution was affected by tectonic stress and geological structure, fold and fault structure factors affected significantly.
|
|
|
|
|
|
| [ 1 ] 刘允芳. 岩体地应力与工程建设[ M ]. 武汉: 湖北科学技术出版社, 2000.[ 2 ] 杨林德. 岩土工程问题的反演理论与工程实践[ M ]. 北京: 科学出版社, 1996.[ 3 ] 郭怀志,马启超,薛玺成,等. 岩体初始应力场的分析方法[ J ] . 岩土工程学报, 1983, 5(3): 64 - 75.[ 4 ] 景 锋, 尹健民, 陈 昊, 等. 考虑复杂地质成因的工程区地应力场反演[ J ]. 长江科学院院报. 2009,26(9):51 - 54.[ 5 ] 姚显春,李 宁,曲 星,等. 拉西瓦水电站地下厂房三维高地应力反演分析[ J ]. 岩土力学,2010,31(1): 246 -252. |
|
|
|