| Study on Overwhelmed Hydraulic Supports in Rock Inclusion Area Large Mining Height Working Face |
| WANG Zhi-gang, LI Tong-da, LI Shi-jun, WANG Jin-guang |
| 1. Technology Department of Jinhuagong Mine, Datong 830002, China ;2.College of Resources & Safety Engineering, China University of Mining & Technology(Beijing), Beijing 100083, China |
|
|
|
|
Abstract Aiming to solve the overwhelmed hydraulic supports problems occurred at broken roof area in 8212 fully mechanized working face in Jinhuagong Mine, related mine pressure data and phenomenon were analyzed. Besides, the reasons of the problems were summarized. The hard and difficultly caved roof, largely ranged coal seam thickness and integrity of overlying strata. The other main reason was subjective factor consists of inadequate working resistance, setting load and low face advance speed, which provided a reference for the mine working face safe and effective stoping adjacent guidance.
|
|
|
|
|
|
| [ 1 ] 姜福兴, 朱斯陶,刘金海等. 深井综采(放)工作面异常来压控制研究[ J ]. 岩石力学与工程学报, 2013, 32(8):1528 - 1536.[ 2 ] 鞠金峰,许家林,朱卫兵,等. 大柳塔煤矿22103综采面压架机理及防治技术[ J ]. 煤炭科学技术, 2012,40(2): 4 - 8.[ 3 ] 熊晓英, 李俊斌. 1402(3)综采工作面压架原因分析[ J ]. 中国煤田地质,2004,16(3): 34 - 37.[ 4 ] 罗 文 . 浅埋大采高综采工作面末采压架冒顶处理技术[ J ]. 煤炭科学技术,2013, 41(9): 128 - 131,148.[ 5 ] 靳钟铭,牛彦华,魏锦平等. “两硬”条件下综放面支架围岩关系[ J ]. 岩石力学与工程学报, 1998,17(5): 514 - 520.[ 6 ] 林光侨. 浅埋煤层采场矿压规律及支架合理工作阻力研究 [ D ]. 北京:中国矿业大学(北京),2013.[ 7 ] 钱鸣高, 石平五,许家林. 矿山压力与岩层控制[ M ]. 徐州: 中国矿业大学出版社,2010. |
|
|
|