Abstract In order to make sure safe operation of Jizhong South roadway in Shuangliu Mine coalfield, release the coal resources to the greatest extent simultaneously, vertical section method was adopted to protect roadway coal pillar in minable coal seam ( No. 2, 3, 4, 8, 9 ), overlapped coal quantity in Jinzhong south roadway was estimated, probability integral method was adopted to verify the rationality of this coal pillar width. The result showed coal seam group of protective coal pillar width was 274~774 m in coalfield, which could control the surface deformation effectively, roadway deformation control was in national protective level scope, which did not affect the safe operation of the railway, ensure resource maximum extraction.
|
|
|
|
|
|
| [ 1 ] 陈清通,文学宽.铁路下煤层群留设保护煤柱方法的选择和计算[ J ].煤矿开采,2008,13(6 ):28 - 29.[ 2 ] 王清悦. 保护煤柱留设方法的探讨与实践[ J ].山东煤炭科技,1999(3):56-58.[ 3 ] 周 泽,李青峰. 铁路下采煤保护煤柱设计[ J ].矿业工程研究, 2012(3):23-27.[ 4 ] 汤伏全.基于地表变形预计的矿区保护煤柱留设方法[ J ].西安科技大学学报,2009(3):65-68..[ 5 ] 曹录俊.王村煤矿特厚黄土层覆盖区铁路保护煤柱留设问题探讨[ J ].矿山测量,2011,10(5 ):80-81.[ 6 ] 魏峰远,陈俊杰,邹友峰. 垂直剖面法保护煤柱设计的解析模型[ J ]. 煤炭学报,2008,33(3 ):18-20.[ 7 ] 国家煤炭工业局.建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[ M ]. 北京:煤炭工业出版社,2000.[ 8 ] 曹 利,刘 辉,张宏贞,等.铁路桥隧下保护煤柱合理留设及安全性评价[ J ]. 煤矿安全,2014,45(3 ):193 - 196. |
|
|