|
|
|
| Analysis of Petrochemical Equipment Frame Construction and Structure Condition |
| SHAN Ting-Liang |
| Hebei Hongda Lvzhou Engineering Design Corporation Ltd., Shijiazhuang 050081, China |
|
|
|
|
Abstract Take the petroleum chemical device frame of Hualu Hengsheng project as an example, by analyzing the inherent characteristics of frame construction as well as the process conditions and the structure of the device, the influence factors that cause the oversize of petrochemical equipment frame were summarized. From technology conditions perspective, by providing some measures to come up with accurate data input for professional design of safe and economic frame structure. Thereby, finally saving cost for construction.
|
|
|
|
|
|
| [ 1 ] GB/T50083—97,《 建筑结构设计术语和符号标准》[ S ].[ 2 ] GB J2—88,《 建筑模数协调统一标准 》[ S ].[ 3 ] GB50009—2001,《 建筑结构荷载规范 》(2006年版)[ S ]. |
|
|
|