| [ 1 ] 弓培林. 大采高采场围岩控制理论及应用研究[ M ]. 北京:煤炭工业出版社,2006.[ 2 ] 史元伟. 采煤工作面围岩控制原理和技术[ M ]. 北京:中国矿业大学出版社,2003.[ 3 ] 刘子龙,张振伟. 木城涧煤矿“8.24”片帮事故机理分析[ J ]. 煤炭工程,2010(90):49 - 51.[ 4 ] 王家臣. 极软厚煤层煤壁片帮与防治机理[ J ]. 煤炭学报,2007,32(8):785 - 788.[ 5 ] 尹希文,闫少宏,安 宇. 大采高综采面煤壁片帮特征分析与应用[ J ]. 采矿与安全工程学报,2008,25(2):222 - 225.[ 6 ] 靳俊恒,孟祥瑞,高召宁. 煤壁片帮失稳的尖点突变模型分析[ J ]. 矿业安全与环保,2011,38(5):77 - 80.[ 7 ] 陈 亮,孟祥瑞,高召宁,等. 大采高综采工作面煤壁片帮机理分析[ J ]. 煤炭科学技术,2011,39(5):18 - 20.[ 8 ] 牛艳奇,陈树义,刘俊峰. 大采高综采工作面片帮加剧机理分析及防治措施[ J ]. 煤炭科学技术,2010,38(7):38 - 41.[ 9 ] YUAN Yong, TU Shi-hao, WU Qi, et al. Mechanics of rib spalling of high coal walls under fully-mechanized mining [ J ]. Mining Science and Technology, 2011, 21(1): 129 - 133. [10] 袁 永,屠世浩,马小涛,等. “三软”大采高综采面煤壁稳定性及其控制研究[ J ]. 采矿与安全工程学报,2012,29(1):21 - 25. [11] 刘长友,黄炳香,常兴民,等. 极软厚煤层大采高台阶式综采端面煤岩稳定性控制研究[ J ]. 中国矿业大学学报,2008,37(6):734 - 739.[12] 华心祝,谢广祥. 大采高综采工作面煤壁片帮机理及控制技术[ J ]. 煤炭科学技术,2008,36(9):1 - 3.[13] Hucka V,Das B. Brittleness determination of rocks by different methods[J]. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts,1974,11(10 ):389 - 392.[14] 李庆辉,陈 勉,金 衍,等. 页岩脆性的室内评价方法及改进[ J ]. 岩石力学与工程学报,2012,31(8):1 680 -1 685.[15] LI Qinghui, CHEN Mian, JIN Yan, et al. Indoor evaluation method for shale brittleness and improvement[ J ]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(8):1 680 - 1 685.[16] Altindag R. The evaluation of rock brittleness concept on rotary blast hole drills. The South African Institute of Mining and Metallurgy, 2002, 102(1):61 - 66.[17] Altindag R. Correlation of specific energy with rock brittleness concepts on rock cutting[ J ]. The South African Institute of Mining and Metallurgy, 2003, 103(3):163 - 172.[18] 白庆升,屠世浩,袁 永,等. 基于采空区压实理论的采动响应反演[ J ]. 中国矿业大学学报,2013,42(3):355 - 361.[19] Yavuz H. An estimation method for cover pressure re-establishment distance and pressure distribution in the goaf of longwall coal mines[ J ]. International Journal of Rock Mechanics & Mining Sciences, 2004, 41(2):193 - 205.[20] Cheng YM, Wang JA, Xie GX, et al. Three-dimensional analysis of coal barrier pillars in tailgate area adjacent to the fully mechanized top caving mining face[ J ]. International Journal of Rock Mechanics and Mining Science, 2010, 47: 1 372 - 1 383.[21] Jiang YD, Wang HW, Xue S, et al. Assessment and mitigation of coal bump risk during extraction of an island longwall panel[ J ]. International Journal of Coal Geology, 2012, 95: 20 - 33.[22] 宁 宇. 大采高综采煤壁片帮冒顶机理与控制技术[ J ]. 煤炭学报,2009,34(1):50 - 52.[23] 张银亮,刘俊峰,庞义辉,等. 液压支架护帮机构防片帮效果分析[ J ]. 煤炭学报,2010,36(4):691 - 695.[24] 闫少宏,尹希文. 大采高综放开采几个理论问题的研究[J]. 煤炭学报,2008,33(5):481 - 484.[25] 王国法,庞义辉,刘俊峰. 特厚煤层大采高综放开采机采高度的确定与影响[ J ] . 煤炭学报,2012,37(11):1 777 - 1 782. |