Abstract Based on Yunjialing mine surrounding rock roadway construction project, which encountered winds hammering blasting, pa rock machine loading, canister, etc. tanker transport constrainted rock roadway level, by improving the drilling rock heading holes and gangue shipping methods, the level of rock into a single lane was improved to achieve a rock roadway modernization of production, solving the problem of rapid construction of rock roadway.
|